A cabride video from a JR Yamanote line train operated by E235 series from Tamachi station to Shinagawa station.
On November 16th, 2019 Yamanote line and Keihin Tohoku line was rerouted to a new route which goes through Takanawa Gateway station, still under construction to open in 2020, between Tamachi station and Shinagawa station. This movie was taken on the day before the reroute from a Yamanote line operated on the tracks which will not be used from the next day.
Information
- Section
- Yamanote Line (Outer circle) Tamachi station to Shinagawa station
- Date
- November 15th, 2019
- Train type
- E235 series (クハE234-25)
Highlights
The new tracks and speed restriction
【00:50】After leaving Tamachi station, a new set of tracks branch off to the left. These set of tracks lead to the Takanawa Gateway station which is under construction. On the next day the Yamanote line will be rerouted to these new tracks. Due to the construction, there is a temporary speed restriction.
The Keihin Tohoku line overpass
【01:20】The Yamanote line goes under the overpass for Keihin Tohoku line. This bridge will be removed after the reroute of the Yamanote line and the Keihin Tohoku line to Takanawa Gateway station.
Takanawa Gateway station
【01:40】Seen on the left side is the Takanawa Gateway station which is currently under construction. The surrounding area will be redeveloped and skyscrapers are scheduled to be built.
The new tracks and speed restriction
【02:30】Before arriving at Shinagawa station, the new set of tracks from Takanawa Gateway station will be rejoining. There is a speed restriction here too.