Cabride video
About this video
A cabride video from a JR Yamanote line train operated by E235 series from Ikebukuro station to Ueno station.
On November 16th, 2019 Yamanote line and Keihin Tohoku line was rerouted to a new route which goes through Takanawa Gateway station, scheduled to open in 2020, between Tamachi station and Shinagawa station. On the day of the reroute, operation of the Yamanote line between Ueno station and Tokyo station and Osaki station was suspended. This video was taken from a Yamanote line partly operated between Ueno station and Ikebukuro.
In regular service there are no trains finishing at Ueno station.
Information
- Section
- Yamanote Line (Outer circle) Ikebukuro station to Ueno station
- Date
- November 16th, 2019
- Train type
- E235 series (クハE234-3)
Highlights
Indicator orders delay of departure
【15:40】At Uguisudani station, to adjust interval of trains, departure is delayed. The indicator on the left shows "延発" which means an order to delay departure.
Side track at Ueno station
【19:30】The train that just arrived at Ueno station is driven in to the side track.
Running along with a train from the side track
【21:00】The train on the side track is driven into Ueno station again, and can be seen running along.